久久国产免费观看精品,亚洲av无码精品色午夜,伊人久久精品一区二区三区 ,国产AV巨作丝袜秘书,亚洲精品一区二区三区大桥未久,亚洲国产日韩在线视频,综合欧美视频一区二区三区,久久亚洲精品日本波多野结衣
      LANGUAGE:中 文
      CONTACT THE HOTLINE:0577-86638259
      Attention to the demolition of construction machinery seals
      2016-01-20 丨 Click: 1617

      Engineering mechanical seal Remove the note:

      In the installation and disassembly of mechanical seal carefully, prohibited the use of hammer and chisel, so as not to damage the sealing element. If not remove fouling, should be cleaned after removing.

      If both ends in the pump with mechanical seal, take care of each other in the assembly, the disassembly process, prevent the care for this and lose that.

      On the operation of mechanical seal, the sealing gland where there is loose move, then the dynamic and static ring parts must be replaced, should not continue to use re tightening. Because after the loosening of friction will change the original orbit, the contact surface of the seal is very vulnerable to damage.


      Engineering mechanical seal Ready to start work before:

      Check the mechanical seal, and ancillary equipment and pipeline installation is complete, compliance with technical requirements.

      Mechanical seal before the start of the hydrostatic test, check the mechanical seal leaks. If the leakage is more, should identify the reasons to eliminate. If still valid, you should remove and reinstall the check. The general static pressure test pressure of 2~3 kg / cm2.

      According to the pump rotate to turning check whether a uniform. Such as turning demanding or not move, it should check whether the assembly size error installation is reasonable.


      Engineering mechanical seal Install and outage:

      Before the start should be kept sealed cavity filled with liquid. To deliver solidified medium, the application of steam seal chamber heating melt medium. Before the start must be turning in order to prevent the sudden start caused by soft ring fragmentation.

      For the use of pump oil sealing system of the mechanical seal, the sealing oil system should be the first to start. Finally stop the seal oil system of parking.

      Can't stop cooling water sealed oil chamber and seal oil pump after the shutdown, should be the end seal oil temperature dropped to 80 degrees below, can stop the cooling water, so as not to damage the sealing parts.

      CONTACT

      MORE
      Contacts :Mr.Frank Chen
      Email:yfplas@vip.163.com
      Mobile :+86-15858755653
      Te l :+86-0577-86638259
      Whatsapp : 0086-158 5875 5653
      Fax :0577-86621759

      主站蜘蛛池模板: 国产亚洲精品在av| 色欲香天天天综合网站无码| 成年无码av片在线蜜芽| 最新亚洲人成无码网站欣赏网| 亚洲综合网一区中文字幕| 亚洲熟女乱综合一区二区三区| 久久这里有精品国产电影网| 亚洲av色一区二区三区| 欧美熟妇性XXXX欧美熟人多毛 | 一本久久a久久精品综合| 日韩av无码精品人妻系列| 中文字幕国产精品综合| 狠狠躁夜夜躁人人爽天天bl| 日韩欧美第一区二区三区| 亚洲人成网站77777在线观看| 国产91丝袜在线观看| 欧美性猛交xxxx免费看| 暖暖 在线 日本 免费 中文| 四虎在线播放亚洲成人| 国产视频一区二区在线看| 免费看欧美日韩一区二区三区| 久久精品中文无码资源站| 在线观看成人av天堂不卡| 国产成人精品高清不卡在线| 97夜夜澡人人双人人人喊| 精品一区二区三区国产馆| 国产小嫩模无套中出视频| 国产成版人视频网站免费下| 欧洲熟妇熟女久久精品综合| 亚洲综合在线日韩av| 日本高清在线播放一区二区三区| 亚洲第一极品精品无码久久| 超碰人人超碰人人| 人成午夜大片免费视频77777| 麻豆国产成人AV在线播放| 色吊丝av中文字幕| 激情综合网五月激情五月| 中文字幕在线不卡一区二区| 国产精品亚洲玖玖玖在线观看 | 日韩精品一区二区亚洲专区| 一区二区韩国福利网站|